    3333'''Scope:''' 
    34  * All functionality specified in [wiki:BurnstationPrototypeDesign] must be met 
     34 * All functionality specified in the [wiki:BurnstationPrototypeDesign Prototype Design] page must be met 
     35 * Design document for full production system & project plan showing how it will be developed must be produced 
    3536 
    3637'''Quality:''' 
     
    4243== Objectives / Goals == 
    4344 
     45 * Demonstrate that it is possible to produce a DVD that can be played in any standard DVD player and contains videos from a Plumi system  
     46 * Determine the effort required to progress from the prototype to a full production quality system 
    4447 
    4548== Deliverables / Scope == 
    4649 
     50=== Prototype System === 
     51 
     52 * A functioning prototype system that presents the user experience & functionality as specified in the [wiki:BurnstationPrototypeDesign Prototype Design] page. 
     53 
     54=== Full Production System Design Document === 
     55 
     56 * Document that describes how the full production Burnstation system will operate, including user experience & technical design 
     57 * To be produced by EM staff based on information provided by the Unweb team 
     58 
     59=== Full Production System Project Plan === 
     60 
     61 * Project plan showing groups involved in producing the full production Burnstation system including deliverables, tasks, risks and reporting plan 
     62 
    4763== Work Breakdown / Timeline == 
     64 
     65 * Confirm prototype design - including resolution of initial issues (Unweb, GM, AL) 
     66 * Coding (Unweb) 
     67  * Modify transcoder 
     68  * Create new plone modules for "Burn This" control & Start Burn page 
     69  * Create new burnstation component 
     70 * Initial Testing (Unweb & GM) 
     71  * transcoder creates VOBs as required 
     72  * plone modules can be incorporated into testing,plumi.org 
     73  * ISOs can be produced from videos on testing.plumi.org 
     74 * Demo testing (GM & ???) 
     75  * Deploy to final demo system to test installation & operation 
     76 * Production system design 
     77  * Prepare notes on user experience & technical design for full production system (Unweb, GM, AL) 
     78  * Document production system design (GM) 
     79  * Document production system project plan (GM) 
     80 
    4881 
    4982== Resources External to Project Team ==